CALL US FOR MORE INFORMATION 071 88 44 916     |     EMAIL US   info@highlevelresidencies.com

Apartment Specifications

  • SUB STRUCTURE
    Random Rubble Masonry work, RCC Columns RCC Plinth Beam.

  • SUPER STRUCTURE
    RCC Columns, Beams, Slabs, 9 thick brick walls at outer perimeter and 4.5 thick brick walls to satisfy the design requirement.

  • FLOOR FINISHES
    LIVING, DINING & BED ROOMS To be laid with non slippery ceramic floor tiles.
    VERANDAH & BALCONIES Laid with non slippery rustic ceramic tiles.

  • TOILET FINISHES
    FLOOR: Non slippery ceramic tiles laid, surface Shall be water proofed WALL laid with ceramic or porcelain tiles up to a height of 7ft in all areas. above tile level shall be plastered and painted with CIC or equivalent approved quality paint.

  • WALL FINISHES
    Smooth plaster on inside walls with one coat of wall putty applied along with 2 coats of emulsion paint (CIC or equivalent).
    Semi - rough plaster on external walls with a wall filter applied along with 2 coats of weather shield paint (CIC or equivalent).

  • PANTRY
    Modern pantry unit to a length of 12 including top and bottom cupboards with wall tiles in between 3rd cupboards Chrome plated, swan neck tap and stainless steel sink (Single bowl, single drain).

  • PLUMBING WORK
    All bathroom fittings and accessories are Rocell / Duravit or equivalent.
    A white Commode with cistern, wash basin and shower rose, Mirror, soap tray, hand bidet, toilet paper holder and towel rack shall be fixed in the bathroom.

  • ELECTRICAL WORK
    230V/30 AMP Three phase power supply with separate meter Ceiling Fans in Living, Dining and bed rooms (KDK or equivalent) 15 Amp socket outlets Shaver socket outlet in Meter Bath Room
    TV socket outlet in Living area and Master Bed Room Telephone socket outlet in Master Bed Room and Pantry light fittings as directed by the Architect All accessories shall be ORANGE or equivalent

  • DOORS & WINDOWS
    FRONT & VERANDAH Mahogany sash and Red Balaw Frame. INTERNAL DOORS Plywood sash and Red Balaw Frame.
    WINDOWS Powder coated aluminium FAN LIGHTS Powder coated aluminium

  • WATER SUPPLY
    UPVC cold pipe network via a PVC water tank Placed above the building. Supply to underground sump from National Water Supply Board and pump to the overhead tank built inside the complex Washing machine inlet and Outlet in the balcony area.

  • STORM WATER DRAINAGE
    Zinc - Alumn gutters and down pipes fixed to roof and surface drain system with manholes..

  • COLOUR SCHEME
    As directed by the Architect.

  • GENERAL
    Garden area to be leveled and turfed Separate electricity and water meter to the unit Parking slot allocated shall be changed garbage collecting point inside the complex.


Copyright © Higl Level Residencies. All Rights Reserved.
Design by SL Web Creations